Логотип exploitDog
Консоль
Логотип exploitDog

exploitDog

redhat логотип

CVE-2026-23371

Опубликовано: 25 мар. 2026
Источник: redhat
EPSS Низкий

Описание

In the Linux kernel, the following vulnerability has been resolved: sched/deadline: Fix missing ENQUEUE_REPLENISH during PI de-boosting Running stress-ng --schedpolicy 0 on an RT kernel on a big machine might lead to the following WARNINGs (edited). sched: DL de-boosted task PID 22725: REPLENISH flag missing WARNING: CPU: 93 PID: 0 at kernel/sched/deadline.c:239 dequeue_task_dl+0x15c/0x1f8 ... (running_bw underflow) Call trace: dequeue_task_dl+0x15c/0x1f8 (P) dequeue_task+0x80/0x168 deactivate_task+0x24/0x50 push_dl_task+0x264/0x2e0 dl_task_timer+0x1b0/0x228 __hrtimer_run_queues+0x188/0x378 hrtimer_interrupt+0xfc/0x260 ... The problem is that when a SCHED_DEADLINE task (lock holder) is changed to a lower priority class via sched_setscheduler(), it may fail to properly inherit the parameters of potential DEADLINE donors if it didn't already inherit them in the past (shorter deadline than donor's at that time). This might lead to bandwidth accounting corruption, as enqueue_task_dl() won't recognize the lock holder as boosted. The scenario occurs when:

  1. A DEADLINE task (donor) blocks on a PI mutex held by another DEADLINE task (holder), but the holder doesn't inherit parameters (e.g., it already has a shorter deadline)
  2. sched_setscheduler() changes the holder from DEADLINE to a lower class while still holding the mutex
  3. The holder should now inherit DEADLINE parameters from the donor and be enqueued with ENQUEUE_REPLENISH, but this doesn't happen Fix the issue by introducing __setscheduler_dl_pi(), which detects when a DEADLINE (proper or boosted) task gets setscheduled to a lower priority class. In case, the function makes the task inherit DEADLINE parameters of the donoer (pi_se) and sets ENQUEUE_REPLENISH flag to ensure proper bandwidth accounting during the next enqueue operation.

    A flaw was found in the Linux kernel's sched/deadline component. When a SCHED_DEADLINE task, which is a type of real-time task, has its priority class changed to a lower setting, it may not correctly inherit parameters from other DEADLINE tasks. This can lead to corruption in the bandwidth accounting mechanism, potentially causing system instability or unexpected behavior.

Затронутые пакеты

ПлатформаПакетСостояниеРекомендацияРелиз
Red Hat Enterprise Linux 10kernelNot affected
Red Hat Enterprise Linux 6kernelNot affected
Red Hat Enterprise Linux 7kernelNot affected
Red Hat Enterprise Linux 7kernel-rtNot affected
Red Hat Enterprise Linux 8kernelNot affected
Red Hat Enterprise Linux 8kernel-rtNot affected
Red Hat Enterprise Linux 9kernelNot affected
Red Hat Enterprise Linux 9kernel-rtNot affected

Показывать по

Дополнительная информация

Дефект:
CWE-372
https://bugzilla.redhat.com/show_bug.cgi?id=2451161kernel: sched/deadline: Fix missing ENQUEUE_REPLENISH during PI de-boosting

EPSS

Процентиль: 6%
0.00024
Низкий

Связанные уязвимости

ubuntu
9 дней назад

In the Linux kernel, the following vulnerability has been resolved: sched/deadline: Fix missing ENQUEUE_REPLENISH during PI de-boosting Running stress-ng --schedpolicy 0 on an RT kernel on a big machine might lead to the following WARNINGs (edited). sched: DL de-boosted task PID 22725: REPLENISH flag missing WARNING: CPU: 93 PID: 0 at kernel/sched/deadline.c:239 dequeue_task_dl+0x15c/0x1f8 ... (running_bw underflow) Call trace: dequeue_task_dl+0x15c/0x1f8 (P) dequeue_task+0x80/0x168 deactivate_task+0x24/0x50 push_dl_task+0x264/0x2e0 dl_task_timer+0x1b0/0x228 __hrtimer_run_queues+0x188/0x378 hrtimer_interrupt+0xfc/0x260 ... The problem is that when a SCHED_DEADLINE task (lock holder) is changed to a lower priority class via sched_setscheduler(), it may fail to properly inherit the parameters of potential DEADLINE donors if it didn't already inherit them in the past (shorter deadline than donor's at that time). This might lead to bandwidth accounting corruption, as enqueue_task_dl() w...

nvd
9 дней назад

In the Linux kernel, the following vulnerability has been resolved: sched/deadline: Fix missing ENQUEUE_REPLENISH during PI de-boosting Running stress-ng --schedpolicy 0 on an RT kernel on a big machine might lead to the following WARNINGs (edited). sched: DL de-boosted task PID 22725: REPLENISH flag missing WARNING: CPU: 93 PID: 0 at kernel/sched/deadline.c:239 dequeue_task_dl+0x15c/0x1f8 ... (running_bw underflow) Call trace: dequeue_task_dl+0x15c/0x1f8 (P) dequeue_task+0x80/0x168 deactivate_task+0x24/0x50 push_dl_task+0x264/0x2e0 dl_task_timer+0x1b0/0x228 __hrtimer_run_queues+0x188/0x378 hrtimer_interrupt+0xfc/0x260 ... The problem is that when a SCHED_DEADLINE task (lock holder) is changed to a lower priority class via sched_setscheduler(), it may fail to properly inherit the parameters of potential DEADLINE donors if it didn't already inherit them in the past (shorter deadline than donor's at that time). This might lead to bandwidth accounting corruption,

msrc
8 дней назад

sched/deadline: Fix missing ENQUEUE_REPLENISH during PI de-boosting

debian
9 дней назад

In the Linux kernel, the following vulnerability has been resolved: s ...

github
9 дней назад

In the Linux kernel, the following vulnerability has been resolved: sched/deadline: Fix missing ENQUEUE_REPLENISH during PI de-boosting Running stress-ng --schedpolicy 0 on an RT kernel on a big machine might lead to the following WARNINGs (edited). sched: DL de-boosted task PID 22725: REPLENISH flag missing WARNING: CPU: 93 PID: 0 at kernel/sched/deadline.c:239 dequeue_task_dl+0x15c/0x1f8 ... (running_bw underflow) Call trace: dequeue_task_dl+0x15c/0x1f8 (P) dequeue_task+0x80/0x168 deactivate_task+0x24/0x50 push_dl_task+0x264/0x2e0 dl_task_timer+0x1b0/0x228 __hrtimer_run_queues+0x188/0x378 hrtimer_interrupt+0xfc/0x260 ... The problem is that when a SCHED_DEADLINE task (lock holder) is changed to a lower priority class via sched_setscheduler(), it may fail to properly inherit the parameters of potential DEADLINE donors if it didn't already inherit them in the past (shorter deadline than donor's at that time). This might lead to bandwidth accounting corruptio...

EPSS

Процентиль: 6%
0.00024
Низкий