Описание
In the Linux kernel, the following vulnerability has been resolved:
thunderbolt: Tear down inactive DP tunnels when the domain is stopped
tb_stop() only tears down DMA tunnels so a DP tunnel that is still
waiting for dprx_work to complete keeps that work queued while the
routers are removed and the control channel is stopped. The work only
stops once the DPRX timeout has passed and because it requeues itself
until then the flush_workqueue() in tb_domain_remove() won't wait for its
final run. The callback then runs against a domain that is already torn
down. A reference to that domain is kept so the completion waiting for
that domain to disappear in unbind will block until the timeout is
eventually reached.
Tear down DP tunnels that are not active yet as well which also cancels
that work. Tunnels for displays that are already alive are untouched and
keep working.
A flaw was found in the Linux kernel's Thunderbolt subsystem. This vulnerability can lead to a Denial of Service (DoS) or system instability when a Thunderbolt device is disconnected or unbound. When a Thunderbolt domain is stopped, inactive DisplayPort (DP) tunnels are not properly torn down, allowing scheduled background tasks to continue running after the domain has been dismantled. A local privileged user or physically present attacker can trigger this flaw by unbinding or disconnecting a device during DisplayPort tunnel initialization, causing the domain removal process to hang or execute callbacks against torn-down resources.
Затронутые пакеты
| Платформа | Пакет | Состояние | Рекомендация | Релиз |
|---|---|---|---|---|
| Red Hat Enterprise Linux 10 | kernel | Fix deferred | ||
| Red Hat Enterprise Linux 6 | kernel | Not affected | ||
| Red Hat Enterprise Linux 7 | kernel | Not affected | ||
| Red Hat Enterprise Linux 7 | kernel-rt | Not affected | ||
| Red Hat Enterprise Linux 8 | kernel | Not affected | ||
| Red Hat Enterprise Linux 8 | kernel-rt | Not affected | ||
| Red Hat Enterprise Linux 9 | kernel | Fix deferred | ||
| Red Hat Enterprise Linux 9 | kernel-rt | Not affected | ||
| Red Hat OpenShift Container Platform 4 | openshift/ose-rhel-coreos-8 | Not affected | ||
| Red Hat OpenShift Container Platform 4 | openshift/ose-rhel-coreos-9 | Fix deferred |
Показывать по
Дополнительная информация
Статус:
EPSS
1.9 Low
CVSS3
Связанные уязвимости
In the Linux kernel, the following vulnerability has been resolved: thunderbolt: Tear down inactive DP tunnels when the domain is stopped tb_stop() only tears down DMA tunnels so a DP tunnel that is still waiting for dprx_work to complete keeps that work queued while the routers are removed and the control channel is stopped. The work only stops once the DPRX timeout has passed and because it requeues itself until then the flush_workqueue() in tb_domain_remove() won't wait for its final run. The callback then runs against a domain that is already torn down. A reference to that domain is kept so the completion waiting for that domain to disappear in unbind will block until the timeout is eventually reached. Tear down DP tunnels that are not active yet as well which also cancels that work. Tunnels for displays that are already alive are untouched and keep working.
In the Linux kernel, the following vulnerability has been resolved: thunderbolt: Tear down inactive DP tunnels when the domain is stopped tb_stop() only tears down DMA tunnels so a DP tunnel that is still waiting for dprx_work to complete keeps that work queued while the routers are removed and the control channel is stopped. The work only stops once the DPRX timeout has passed and because it requeues itself until then the flush_workqueue() in tb_domain_remove() won't wait for its final run. The callback then runs against a domain that is already torn down. A reference to that domain is kept so the completion waiting for that domain to disappear in unbind will block until the timeout is eventually reached. Tear down DP tunnels that are not active yet as well which also cancels that work. Tunnels for displays that are already alive are untouched and keep working.
thunderbolt: Tear down inactive DP tunnels when the domain is stopped
In the Linux kernel, the following vulnerability has been resolved: t ...
In the Linux kernel, the following vulnerability has been resolved: thunderbolt: Tear down inactive DP tunnels when the domain is stopped tb_stop() only tears down DMA tunnels so a DP tunnel that is still waiting for dprx_work to complete keeps that work queued while the routers are removed and the control channel is stopped. The work only stops once the DPRX timeout has passed and because it requeues itself until then the flush_workqueue() in tb_domain_remove() won't wait for its final run. The callback then runs against a domain that is already torn down. A reference to that domain is kept so the completion waiting for that domain to disappear in unbind will block until the timeout is eventually reached. Tear down DP tunnels that are not active yet as well which also cancels that work. Tunnels for displays that are already alive are untouched and keep working.
EPSS
1.9 Low
CVSS3